BIM in off-site manufacturing for buildings

Abanda, F.H. and Tah, J.H.M. and Cheung, Franco (2017) BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14 (Nov-17). pp. 89-102. ISSN 2352-7102

Full text not available from this repository. (Request a copy)

Abstract

The need to overcome challenges faced by construction industry has been at the core of many government reports. Most of the reports suggest the adoption of innovations including off-site manufacture and emerging Building Information Modelling (BIM) to overcome the challenges facing the industry. Current research has largely focused on the impacts of off-site manufacture and BIM independently applied on traditional construction methods. Due to the factory-based nature of off-site manufacture, the benefits of BIM on off-site manufacture have been widely argued to be far greater than those of traditional construction. However, studies about impacts of BIM on off-site manufacture are scarce with far too many on traditional construction. This study investigates the implications of BIM systems on off-site manufacture and traditional construction methods, with emphasis on the technological potential of BIM for off-site manufacture. The specific objectives of the study are threefold. Firstly, it examines how BIM can support off-site manufacture. Secondly, the paper discusses the benefits of BIM and explains how BIM can overcome barriers hindering the uptake of off-site manufacturing. Thirdly, due to the importance to measure the benefits to support wider adoption, an examination of the published quantitative benefits of BIM on off-site manufacture and traditional construction is undertaken. A critical appraisal of the literature was undertaken to achieve the aim of this study. The main findings are the identification of qualitative and quantitative benefits of: BIM on off-site manufacture, off-site manufacture and BIM on traditional construction. The findings reinforce the argument that BIM adoption on off-site manufacturing projects is a rapid, efficient and one of the best ways to improve on the long standing challenges that have plagued the construction industry for generations.

Item Type: Article
Identification Number: https://doi.org/10.1016/j.jobe.2017.10.002
Dates:
DateEvent
6 October 2017Published Online
2 October 2017Accepted
Uncontrolled Keywords: BIM, Challenges, Construction industry, Off-site manufacture, Performance
Subjects: CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-04 - planning (urban, rural and regional)
CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-01 - architecture
CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-02 - building
Divisions: Faculty of Computing, Engineering and the Built Environment
Faculty of Computing, Engineering and the Built Environment > School of Engineering and the Built Environment
Depositing User: Euan Scott
Date Deposited: 28 Jan 2019 16:31
Last Modified: 03 Mar 2022 15:49
URI: https://www.open-access.bcu.ac.uk/id/eprint/6902

Actions (login required)

View Item View Item

Research

In this section...