System information modelling in practice: Analysis of tender documentation quality in a mining mega-project
Love, P.E.D. and Zhou, Jingyang and Matthews, J. and Sing, Michael C. P. and Edwards, D.J. (2017) System information modelling in practice: Analysis of tender documentation quality in a mining mega-project. Automation in Construction, 84. pp. 176-183. ISSN 0926-5805
Preview |
Text
System Information AIC.pdf - Accepted Version Available under License Creative Commons Attribution Non-commercial No Derivatives. Download (764kB) |
Abstract
The quality of information contained in tender documentation produced using Computer-Aided-Design (CAD) and provided in a hard-copy format to an electrical engineering contractor for a port expansion facility, which formed an integral part of an Iron Ore mega-project is analyzed. A System Information Model (SIM), which is an object oriented approach, was retrospectively constructed from the documentation provided to assist the contractor with their tender bid preparation. During the creation of the SIM, a total of 426 errors and omissions were found to be contained within the 77 tender ‘drawing’ documents supplied to the contractor by an Engineering,
Construction, Procurement and Management (EPCM). Surprisingly, 70 drawings referenced in the tender documentation, and the Input/Output lists and Cause/Effect drawings were not provided. Yet, the electrical contractor
was required by the EPCM organization to provide a lump sum bid and also guarantee the proposed schedule would be met; the financial risks were too high and as a result the contractor decided not to submit a bid. It is suggested that if the original tender documentation had been prepared using a SIM rather than CAD, the quality of information presented to the contractor would have enabled them to submit a competitive bid for the works. The research concludes that the economic performance and productivity of mining projects can be significantly improved by using a SIM to engineer and document electrical instrumentation and control (EIC) systems.
Item Type: | Article |
---|---|
Identification Number: | 10.1016/j.autcon.2017.08.034 |
Dates: | Date Event 12 September 2017 Published Online 30 August 2017 Accepted |
Uncontrolled Keywords: | Errors; Omissions; Mining; Object oriented; Information redundancy; SIM |
Subjects: | CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-01 - architecture CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-02 - building CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-04 - planning (urban, rural and regional) |
Divisions: | Faculty of Computing, Engineering and the Built Environment > College of Built Environment |
Depositing User: | Ian Mcdonald |
Date Deposited: | 12 Sep 2017 10:57 |