BIM in off-site manufacturing for buildings
Abanda, F.H. and Tah, J.H.M. and Cheung, Franco (2017) BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14 (Nov-17). pp. 89-102. ISSN 2352-7102
Full text not available from this repository. (Request a copy)Abstract
The need to overcome challenges faced by construction industry has been at the core of many government reports. Most of the reports suggest the adoption of innovations including off-site manufacture and emerging Building Information Modelling (BIM) to overcome the challenges facing the industry. Current research has largely focused on the impacts of off-site manufacture and BIM independently applied on traditional construction methods. Due to the factory-based nature of off-site manufacture, the benefits of BIM on off-site manufacture have been widely argued to be far greater than those of traditional construction. However, studies about impacts of BIM on off-site manufacture are scarce with far too many on traditional construction. This study investigates the implications of BIM systems on off-site manufacture and traditional construction methods, with emphasis on the technological potential of BIM for off-site manufacture. The specific objectives of the study are threefold. Firstly, it examines how BIM can support off-site manufacture. Secondly, the paper discusses the benefits of BIM and explains how BIM can overcome barriers hindering the uptake of off-site manufacturing. Thirdly, due to the importance to measure the benefits to support wider adoption, an examination of the published quantitative benefits of BIM on off-site manufacture and traditional construction is undertaken. A critical appraisal of the literature was undertaken to achieve the aim of this study. The main findings are the identification of qualitative and quantitative benefits of: BIM on off-site manufacture, off-site manufacture and BIM on traditional construction. The findings reinforce the argument that BIM adoption on off-site manufacturing projects is a rapid, efficient and one of the best ways to improve on the long standing challenges that have plagued the construction industry for generations.
Item Type: | Article |
---|---|
Identification Number: | 10.1016/j.jobe.2017.10.002 |
Dates: | Date Event 6 October 2017 Published Online 2 October 2017 Accepted |
Uncontrolled Keywords: | BIM, Challenges, Construction industry, Off-site manufacture, Performance |
Subjects: | CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-04 - planning (urban, rural and regional) CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-01 - architecture CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-02 - building |
Divisions: | Faculty of Computing, Engineering and the Built Environment > College of Built Environment |
Depositing User: | Euan Scott |
Date Deposited: | 28 Jan 2019 16:31 |
Last Modified: | 20 Jun 2024 11:46 |
URI: | https://www.open-access.bcu.ac.uk/id/eprint/6902 |