The antecedents of construction project change: an analysis of design & build procurement application
Smith, J. and Edwards, D.J. and Martek, I. and Chileshe, N. and Roberts, C. and Hayhow, S. (2021) The antecedents of construction project change: an analysis of design & build procurement application. Journal of Engineering Design and Technology. ISSN 1726-0531
Preview |
Text
The antecedents of construction project change.pdf - Accepted Version Available under License Creative Commons Attribution Non-commercial. Download (2MB) |
Abstract
Purpose: This research seeks to excoriate, define and delineate the main drivers of ‘change’ in commercial construction projects and generate guidelines on how to minimise exposure to the associated adverse effects upon project stakeholders.
Methodology: The research adopts mixed doctrines through a combination of epistemological lenses, embracing two primary philosophical stances: (i) interpretivism, to identify the primary drivers of change based on a systematic literature review and (ii) a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study.
Findings: The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors are thematically grouped under headings: extent and severity; time in relation to implementing; instigating party; individual(s) responsible for managing the change; reason for the change; available resource; recoverable or non-recoverable; contract / project type; type of client. Following this, the effects of change on key elements of the project are encapsulated and recommendations for adaptations which may provide improved experiences are offered.
Originality: The study tackles the common issue of managing the deleterious effects of change on commercial construction projects, defining management techniques to minimise stakeholder tribulation.
Item Type: | Article |
---|---|
Identification Number: | 10.1108/JEDT-12-2020-0507 |
Dates: | Date Event 15 December 2020 Accepted 26 February 2021 Published Online |
Uncontrolled Keywords: | Commercial construction; construction industry; change management; project rework; joint contract tribunal; design and build |
Subjects: | CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-02 - building |
Divisions: | Faculty of Computing, Engineering and the Built Environment > College of Built Environment |
Depositing User: | David Edwards |
Date Deposited: | 21 Dec 2020 11:37 |
Last Modified: | 20 Jun 2024 11:45 |
URI: | https://www.open-access.bcu.ac.uk/id/eprint/10626 |
Actions (login required)
![]() |
View Item |