Implementing Lean in Sub-EBQ Manufacturing Environments: A Case Study
Karayath, S.S. and Neighbour, Gareth B and Robson, P. and Gilbert, J.M. (2010) Implementing Lean in Sub-EBQ Manufacturing Environments: A Case Study. In: Second European Conference on Continuous Improvement and Lean, 18-20 January 2010, Six Sigma, Glasgow.
Full text not available from this repository.| Item Type: | Conference or Workshop Item (Paper) | 
|---|---|
| Additional Information: | Published by University of Strathclyde (9 pages). | 
| Dates: | Date Event 2010 Published | 
| Subjects: | CAH10 - engineering and technology > CAH10-01 - engineering > CAH10-01-01 - engineering (non-specific) | 
| Divisions: | Architecture, Built Environment, Computing and Engineering > Engineering | 
| Depositing User: | Oana-Andreea Dumitrascu | 
| Date Deposited: | 09 May 2017 14:43 | 
| Last Modified: | 20 Jun 2024 11:51 | 
| URI: | https://www.open-access.bcu.ac.uk/id/eprint/4398 | 
Actions (login required)
|  | View Item | 
Tools
CORE (COnnecting REpositories)
 Tools
 Tools Tools
 Tools