Causal relationships of moral hazard and adverse selection of Ghanaian public-private partnership (PPP) construction projects

Owusu-Manu, D. and Kukah, A. and Edwards, D.J. and Parn, Erika and El-Gohary, Hatem and Aigbavboa, C. (2018) Causal relationships of moral hazard and adverse selection of Ghanaian public-private partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 16 (3). pp. 439-460. ISSN 1726-0531

[img]
Preview
Text
JEDT Manuscript Revised - Final.pdf - Accepted Version

Download (933kB)

Abstract

The aim of this paper was to assess the causal relationship(s) between moral hazard and adverse selection of Public-Private-Partnership (PPP) construction projects. Structural Equation Modeling (SEM) was used to explore the causes and effects relationships between moral hazard and adverse selection problems in PPP construction projects in Ghana. The study produced a framework to predict, estimate and depict the complex causal relationships (i.e. the directionality) between moral hazard and adverse selection.
To test the proposed framework, a quantitative methodology was employed, in which, data were collected using research questionnaires that targeted a sample of two-hundred and eighty public-private-partnership (PPP) stakeholders in Ghana. A total of two hundred and ten useable questionnaires were retrieved representing a response rate of seventy-five percent.
The interrelationships between the eight causes and nine effects of moral hazard and adverse selection were established using the model. The tested framework showed the degree of association and isolation of the unobserved variables on the indicator factors. Confirmatory Factor Analysis (CFA) was used to evaluate the fit of items to latent constructs. Because the fit of each model was good and the item loadings were adequate, it was assumed that the indicators of the different variables factors were fitting. Furthermore, a diagnostic fit analysis was conducted using the robust maximum likelihood method to test the statistical significance of the parameter estimates.
This novel research is one of the few studies investigating the causal relationships between moral hazard and adverse selection of PPP construction projects. The research concluded with future studies that seek to validate the model developed in other countries and/ or other industries.
The research findings will serve as a guide for construction stakeholders in the PPP sector on the causes and effects of adverse selection and moral hazard, and how to mitigate these.

Item Type: Article
Identification Number: https://doi.org/10.1108/JEDT-12-2017-0137
Dates:
DateEvent
26 March 2018Accepted
1 July 2018Published
Subjects: CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-01 - architecture
CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-02 - building
CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-04 - planning (urban, rural and regional)
CAH17 - business and management > CAH17-01 - business and management > CAH17-01-04 - management studies
CAH17 - business and management > CAH17-01 - business and management > CAH17-01-09 - others in business and management
Divisions: Faculty of Business, Law and Social Sciences > Birmingham City Business School
Depositing User: Users 18 not found.
Date Deposited: 12 Apr 2018 09:13
Last Modified: 22 Mar 2023 11:49
URI: https://www.open-access.bcu.ac.uk/id/eprint/5820

Actions (login required)

View Item View Item

Research

In this section...