Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK

Al-Saeed, Yahya and Edwards, D.J. and Scaysbrook, Stephen (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20 (3). pp. 345-377. ISSN 1471-4175

[img]
Preview
Text
Paper 6 Automating Construction and BDOs (Resumitted_5_1_20)F.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial.

Download (2MB)

Abstract

Purpose
This paper aims to present a novel proof-of-concept framework for implementing building information modeling (BIM) Digital Objects (BDO) to automate construction product manufacturers’ processes and augment lean manufacturing.

Design/methodology/approach
A mixed interpretivist and post-positivist epistemological lens is adopted to pursue the proof-of-concept’s development. From an operational perspective, a synthesis of literature using interpretivism provides the foundation for deductive research inquiry implemented within a case study approach. Within the case study, participatory action research (PAR) is implemented to test the proof of concept via three “waterfall” research phases, namely, literature diagnosis and BIM package selection, BDO development and validation and evaluation.

Findings
The findings illustrate that a BDO (which represents the digital twin of manufacturing products) can augment and drive automation processes and workflows for construction product manufacturers within a contractor’s supply chain. The developed framework illustrates the benefits of a BDO, by reducing the number of manufacturing processes to effectively eliminate early errors in the model, generates financial savings and reduces material wastage.

Originality/value
This research provides a seminal case study that implements BDO to automate construction product manufacturing processes and demonstrates the utilisation of BDO at an operational (vis-à-vis theoretical) level. Future research is proposed to implement a longitudinal approach to measure and report upon the success (or otherwise) of the proof of concept when implemented on fabrications and shop floor procedures.

Item Type: Article
Identification Number: https://doi.org/10.1108/CI-12-2019-0141
Dates:
DateEvent
10 January 2020Accepted
8 February 2020Published
Uncontrolled Keywords: Case study; IoT, Manufacturer; Industry 4.0; Construction supply chain; BIM digital objects;
Subjects: CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-01 - architecture
CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-02 - building
CAH13 - architecture, building and planning > CAH13-01 - architecture, building and planning > CAH13-01-04 - planning (urban, rural and regional)
Divisions: Faculty of Computing, Engineering and the Built Environment
Faculty of Computing, Engineering and the Built Environment > School of Engineering and the Built Environment
Depositing User: Sharmarke Ali
Date Deposited: 14 Jul 2020 14:29
Last Modified: 12 Jan 2022 13:31
URI: https://www.open-access.bcu.ac.uk/id/eprint/9535

Actions (login required)

View Item View Item

Research

In this section...